Projects

Just Track - Machinery 02
Just Track - Machinery 02
Current (since 2023)
Martinus Inland Rail A2P & NMDC

Supply loaders and operators to complete general loader duties and rail works. Dragging rail, laying out concrete sleepers, loading tandem trucks, stockpiles, loading ballast wagons and general clean up.

Just Track - Machinery 08

Current (since 2018)

Lang O'Rourke

Supplying front end loaders on various job sites throughout Melbourne metro area to carry out general loader duties. Dragging rail, laying out concrete sleepers, loading tandem trucks and clean up. Preparing jobs during the week for the weekend shutdowns.

2022-23

Martinus Moorebank Terminal

Supply front end loaders to carry out general loader duties to complete a new container terminal in Moorebank, NSW. Civil works loading tandem trucks, moxy trucks with materials (etc). Complete track work start of November.

2021

Martinus Kalgoorlie

Supply loader operators for general loader works including laying sleepers, placing rail on sleeper, top ballast, and constructing turnouts.

Martinus CRN Project

Supply loaders and operators to complete general loader duties and rail works. Dragging rail, laying out concrete sleepers, loading tandem trucks, stockpiles, loading ballast wagons and general clean up.

2019-20

Fastrak Inland Rail

Supply front end loaders to carry out general loader duties. Dragging rail, laying out concrete sleepers, loading tandem trucks and clean up. Supply ballast box to lay 400km of bottom ballast. Supply RTL and ballast wagons to complete 6km loop of top ballast.

2017-18

Martinus Murray Basin

Supply front end loaders to carry out general loader duties to convert broad gauge to standard gauge. Dragging rail into position, laying timber sleepers out, loading tandem trucks with ballast and site clean-up.

2016-17

Martinus Gold Coast Light Rail

Supply front end loader to carry out general loader duties to complete 14km of track for the Olympic Games and local residents. Dragging rail, laying sleepers out, loading tandem trucks with ballast and site clean-up. Supply RTL and ballast wagons to top ballast.

2015-16

BMD Web Dock | Martinus

Supply front end loaders to carry out general loader duties to complete a new container terminal at Web Dock in Victoria. Civil works loading truck and dog with materials. Loader duties to complete crane rail.

Boggabri Coal Mine Loop

Supply front end loaders L150E and L180E. Dragging rail into place and loading the ballast wagons. Supplied supervisor to carry out track construction. Supplied fitter to carry repairs on site for the project.

2014-16

ARTC Hunter Valley

Supply front end loaders to set up during the week to prepare for the weekend shutdowns and carry out weekend work around the clock. Dragging rail, prep work assisting the FBW, laying sleepers out, loading tandem trucks with ballast and site clean-up. Supply RTL and ballast wagons to top up ballast in various locations for the tamper and regulator.